Tuesday, April 20, 2010

20 April 2010 @ RFC

At 8 in the morning today,I was suppose to attend a toolbox meeting this morning at site, but it was called off due to heavy rain in Kajang. Shortly after that, i followed Mr. Jabbar, the site supervisor of RFC, on a visit to the construction site.We climbed up to the 20th floor of tower A, the highest level of the office block.
To me, i consider it as a very good exercise if i have to climb up every morning.Doing site diary and monitor the progress of the project are a daily task that need to be done by every site supervisor or even site engineer. We managed to snap a few pictures of the surrounding on top of the roof top for documentation of the site progress.
Before we start to walk down from the roof top, Mr.Jabbar shares some of his structural experiences with me . He explained about the slump test which is a test that needs to be carried out for the mix concrete before casting process. Although it is quite a lengthy process, but it was a whole new kind of knowledge to me. At least i learn something new today.
For the moment, this RFC project is mainly concentrating on building up the 10 storey car park as the other two office tower block has been completed. In the afternoon, i was briefed on the procedures of doing the site diary and filing. I also read up on the material request record ( MR for short) and do a bit of arrangement on the files.

No comments:

Post a Comment