During the morning session, there was a toolbox meeting at the site. It is actually a safety briefing that mainly discuss about the ethics at work place and the do's and dont's at construction site. Housekeeping was carried at ground floor of block H in Oasis project. Then there was an activity of transferring the Kumkang aluminium form board form level 9 to the ground floor. In the afternoon, i was assigned by my supervisor to read up and rearrange all the floor plan including architectural and mechanical plan of block H.